Provisions, Stores & Spare-Parts Delivery
BAF Shipping arranges provisions, fuel, water and technical stores for vessels and coordinates logistics so spare parts and equipment reach the ship on time. The service is provided at ports, shipyards and during strait transits.

Scope
- Provisions, fuel and water supply
- Technical stores
- Spare parts and logistics support
- Delivery of materials (to the vessel / shipyard)
- Launch-boat service to reach the vessel
On-time delivery
The supply window is narrow during a transit or short port call. Sending the request early helps us plan the delivery and reduces delay risk.
How are provisions, technical stores and spare parts told apart?
Not everything that goes to a ship travels by the same route or in the same time. Food depends on shelf life and the cold chain; spare parts on customs papers and part numbers; fuel and water on quantity and delivery point. Sorting the request into the right group from the start makes on-time delivery easier.
| Item group | Examples | Planning note |
|---|---|---|
| Food and drink provisions | Fresh and dry food, drinking water, galley items | Shelf life and delivery time matter |
| Deck and engine stores | Rope, paint and brushes, lubricants, workshop consumables | List and quantities must be clear |
| Spare parts | Machinery, equipment and electronic parts | Part number, maker and customs documents are needed |
| Fuel and water | Fuel and fresh water according to the vessel's need | Type, quantity and delivery point should be agreed beforehand |
What steps does a delivery go through after the order?
- Receiving the request: vessel name, IMO, delivery place, date and item list
- Sourcing: preparing the items from suitable suppliers or receiving an incoming shipment
- Customs and documents: processing material of foreign origin or arriving from abroad under the relevant rules
- Logistics: arranging vehicle, launch or carrier to the delivery point
- Delivery: receipt confirmed by the master or an authorised person
- Reporting: delivery details and documents sent to the owner
What should be watched with a spare-parts shipment?
A spare part coming from abroad goes through customs before it reaches the ship. How long that takes depends largely on the completeness of the documents; most delays occur not while the part is in transit but because the paperwork cannot be completed. The points below are a general frame:
- The shipment should be clearly identified with the vessel name and IMO number
- Invoice and transport document (bill of lading or air waybill) should be shared with the agent as soon as the shipment leaves
- The documents should make clear that the goods are for delivery to the vessel and not for staying in the country
- Share the delivery place (yard, port, anchorage) and a contact on the ship
- Allow for authorities slowing down outside working hours or on public holidays
| Mode of transport | Extra point to plan for |
|---|---|
| Air | Logistics between the arrival airport and the vessel's position |
| Road | Vehicle entry and yard or port permits |
| Sea | At which port the container is opened and the customs sequence |
Is delivery made at the quay, in the yard or at anchor?
Delivery to a ship at the quay is by vehicle and depends on the port's entry rules. In a shipyard the delivery point is set by the yard's entry permission and on-site security procedure. A ship waiting at anchor or in a strait transit is reached from shore by launch; weather, sea state and the delivery window then become limiting.
Which method suits depends on the vessel and conditions; permissions and restrictions from the competent bodies can affect the plan.
How much lead time should an order have?
Giving a fixed period would not be right: the timeline for quickly prepared items such as food differs greatly from that of spare parts coming from abroad that need customs processing. The practical rule is to send the item list as soon as the ETA is known, and to send documents for parts needing customs as soon as the shipment leaves.
The supply window is already narrow for transiting vessels or short port calls; the earlier the request arrives, the more likely the delivery is to fit the window.
Which mistakes are common in orders?
- Sending general lists with no quantity or unit
- Not stating the part number, maker and equipment type
- Sharing documents only after the shipment has reached the ship
- Changing the delivery point while the vessel is moving and telling the agent late
- Leaving a part that must clear customs to a time that falls outside working hours
- Not naming in advance who aboard is authorised to sign the receipt
What does BAF not take on in supply and spares delivery?
Sourcing the items, logistics coordination, delivery organisation and reporting are our field; fuel and water are also supplied under provisions on request. We do not take on the technical suitability of the product, choosing the right part, product warranty or the maker's liability; these lie between the owner's technical department and the supplier.
Bunkering itself is a separate specialism and is not offered by BAF as its own service; if you need it, discuss the request with our team. Waste reception, hold cleaning and tugs are likewise ordinary items supplied by third parties and coordinated by the agent.
Which areas are deliveries made from?
Deliveries are planned from our Tuzla branch for vessels in the shipyard area and the Yalova (Altınova) yards, and from our Istanbul offices for vessels around the Bosphorus. Altınova is about 39 km (35 min) by road from the Tuzla branch, so travel time is counted separately in a delivery plan for a ship in Yalova. For other ports, coverage is confirmed when the request is made.
Where we provide it
Last updated: 2026-11-26
Frequently Asked Questions
Do you deliver spare parts to the vessel?
We provide logistics and coordination support for the delivery of spare parts and stores.
Can supplies be delivered during a strait transit?
We organise delivery of provisions and spares before and during the transit.
How is a provisions or spares request sent?
Send it by WhatsApp, phone or the web form with the vessel name, IMO number, delivery place, date and item list. The clearer the list, the faster the supply can be planned.
How is a spare part from abroad processed?
The part goes through customs. The delay risk falls if invoice and transport documents are shared with the agent as soon as the shipment leaves and the shipment is clearly identified as belonging to the vessel. Timing depends on the completeness of the documents.
Do you supply fuel and water?
Fuel and water are supplied under provisions on request; type, quantity and delivery point are clarified when the request is made. Bunkering itself is a separate specialism, so please discuss that with our team.
Can delivery be made to a ship during a strait transit?
Yes; we organise delivery before and during the transit. If the delivery is by launch, weather, sea state and the transit window are decisive, so the request should be sent early.
Who is responsible if the wrong part is supplied?
The technical suitability and correct choice of the part lie between the owner's technical department and the supplier; BAF runs the delivery logistics and the document flow.