BAF Shipping's Tuzla branch (Yayla district, Pınar Street No:7 Unit 35) is in the shipyard area; shipyard agency, crew change, spare-parts delivery and provisioning for vessels in repair, maintenance and dry-docking are run from this office. The district centre is about 2 km away and the Yalova (Altınova) yards about 39 km by road.
Shipyard agency in Tuzla
Tuzla is a district on the Asian side of Istanbul on the Marmara coast (about 138 km²). The branch coordinates the yard, class societies, technical teams and the authorities, and keeps the owner informed with daily reports.
The Tuzla branch is also the operating point for the Yalova shipyards.
How does shipyard agency in Tuzla differ from port agency?
A vessel calling at a port loads or discharges cargo and usually leaves within a short time. A vessel entering a yard stays at the centre of the work for days, sometimes weeks, and many parties gather around it: the yard management, subcontractor workshops, class society surveyors, equipment makers' service engineers, the owner's technical superintendent and the crew. The agent's job is to bring these parties onto the same calendar.
The table below sets the two processes side by side.
| Subject | Port call | Shipyard stay |
|---|---|---|
| Movement of the vessel | Berth, load/discharge, depart | Dock, repair, undock |
| Parties around the vessel | Terminal, customs, port authorities | Yard, workshops, class, makers' service teams, owner's superintendent |
| Incoming material | Provisions and small supplies | Spare parts, technical equipment, tools |
| Reporting | Summary at the end of the call | Daily progress follow-up |
Why does the location of the Tuzla branch matter?
Tuzla is a district at the far south-east of Istanbul on the Marmara coast; its area is 138 km². Wikipedia describes it as Türkiye's largest shipyard zone. Our branch in the Yayla neighbourhood is placed so that the team working here can reach yards, suppliers and the district centre in a short time.
The branch is 2.2 km (4 min) from the district centre; distances to the Zeyport branch and the Beylikdüzü head office are below. Yalova figures are further down this page and on the Yalova page. In other words, the daily trips from the office to a yard gate, a supplier or a hotel in the district centre take far less time than the same trips from an office at the other end of Istanbul.
| Point (from Tuzla district centre) | Straight line | By road | Drive time |
|---|---|---|---|
| Tuzla branch | 1.8 km | 2.2 km | 4 min |
| Zeyport branch | 39.2 km | 46.6 km | 45 min |
| Beylikdüzü head office | 56.5 km | 72.2 km | 68 min |
Which steps does the agent follow when a vessel enters a yard?
Every yard has its own rules; the general flow is as follows and is adapted to the relevant regulation and yard instructions.
- Gathering information on the vessel's expected arrival and the purpose of the yard call (dry-docking, repair, conversion)
- Follow-up of yard entry–exit and related official procedures
- Following the dock plan and the class and survey calendar together with the owner
- A transfer plan for technical staff, surveyors and service engineers to reach the vessel
- Delivery of incoming spare parts and stores to the vessel or yard
- A daily status report to the owner
How do spare parts and stores reach the vessel in Tuzla?
Parts coming from abroad are subject to customs procedures; the form depends on the type and value of the part and the route of arrival, and rules may be updated. It is therefore best to share the invoice, packing list and consignee details with the agent before the shipment leaves.
Parcels should clearly show the vessel name, IMO number, yard name and the agent's contact details; an unlabelled box is one of the most common causes of loss and delay inside a yard. We coordinate domestic and international courier tracking and the final delivery, and schedule the hand-over around the vessel's docking programme.
What is planned for the crew of a vessel in the yard?
Living and service conditions on a vessel in dock can be limited, so crew change, hotel and transfer planning is done together with the yard calendar. Sign on / sign off days often fall on the busiest days of the job, so we recommend sharing arrival times and the list of people who need yard access permission in advance.
What most often causes delay during a yard stay?
The usual sources of delay in yard work are well known and most can be prevented in advance:
- A missing or late parts invoice and packing list
- Cargo with wrong or missing labels
- A survey calendar that clashes with the docking plan
- A list of people needing yard access that is notified too late
- Sign on / sign off times shifting because of flight changes
Area facts
| Item | Value |
|---|---|
| Area | 138 km² |
| By road: Head Office — Ambarlı | 72.2 km · 68 min |
| By road: Zeyport Branch — Zeytinburnu | 46.6 km · 45 min |
| By road: Tuzla Branch | 2.2 km · 4 min |
Sources: Wikipedia/Wikidata (population, area), OpenStreetMap/OSRM (road distances and times; vary with traffic).
Related Services
Shipyard AgencyShipyard agency for repair, maintenance and dry-docking at Tuzla and Yalova yards: …
Crew Change & TransferCrew change (sign on / sign off), airport–port–vessel transfers, hotel and VIP tran…
Supplies & SparesSupply and delivery of provisions, fuel–water, technical stores and spare parts to …Nearby areas
- Pendik Ship Agency: On-Request Coordination Next to the Tuzla Shipyards (~9 km)
- Gebze Ship Agency: Logistics From the Industrial Belt to the Vessel (~11 km)
- Kartal Ship Agency: Requests That Start in the City and Reach Out to the Marmara (~13 km)
- Yalova Shipyard Agency (~18 km)
Last updated: 2026-11-26
Frequently Asked Questions
Where is the Tuzla branch?
Yayla district, Pınar Street No:7 Unit 35, Tuzla / Istanbul.
How far is Altınova (Yalova) from Tuzla?
About 39 km and 35 minutes by road according to OSRM.
Which services does the Tuzla branch run?
Shipyard agency, crew change and transfers, spare-parts delivery and provisioning coordination are run from the Tuzla branch. The Yalova shipyards are within the same branch's service area.
How long does it take from Tuzla to Zeyport and Beylikdüzü?
From the Tuzla district centre it is 46.6 km, about 45 minutes by road to the Zeyport branch, and 72.2 km, about 68 minutes to the Beylikdüzü head office. Times vary with traffic.
What should be written on a parts parcel sent to a shipyard?
The vessel name, IMO number, yard name and the agent's contact details should be clearly visible. Sharing the invoice and packing list beforehand eases customs handling; details are clarified per part.